HDPE Water Supply / Gas Pipeline Production Project
Product Picture:

In the production project of water supply, gas pipeline in HDPE φ20 - 630, Lansu machinery charge from the capacity design, workshop design, auxiliary equipment to the site construction, equipment installation, debugging, testing, final product storage, training of on-site personnel.We have completed the whole project for 4 months and delivered the customer's production smoothly.


Construction site

Production equipment

Equipment debugging


Training of on-site personnel

Final product

Auxiliary equipment

The annual production capacity of the project is up to 20 thousand and 3 thousand tons, the equipment meets the production requirements of pressure water supply pipeline and gas pipeline, so as to achieve high production and energy saving.The program of full automatic feeding system provided by Liansu,is able to realize semi-automatic feeding in first-stage project and realize full-automatic feeding system of pipeline and fittings production workshop in second-stage project.

Case Product